We study the expression of the project operator appeared during research of the reliability model that the system consisting of a reliable machine
an unreliable machine and a storage buffer.By using spectral theory of linear operators
we give the expression of the project operator.Thus we show the time-dependent solution of the model converges exponentially to the steady-state solution of the model.
关键词
Keywords
references
Lan M.The reliability analysis of multistage CIMS production line with buffer[J].Information Control,1991,20(114):28-33.
Li Wei,Gao Jinhua.Some performence measures of transfer line consisting of two unrelible machines with reprocessrule[J].Journal of Systems Science and Systems Engineering,1998,7:283-292.
Geni Gupur,Guo Baozhu.Asymptotic property of the time-dependent solution of a reliability model[J].Journal ofSystems Science and Complexity,2005,18(3):319-339.
Rainer Nagel.One-Parameter Semigroups of Positive Operators[M].Lecture Notes in Mathematics 1184,Springer,Berlin,1986.
Geni Gupur,Li Xue-zhi,Zhu Guang-tian.Functional Analysis Method in Queueing Theory[M].Research InformationLtd,Herfordshire,2001.